Main computer room (MDF) complete
with five new Ortronics Mighty Mo 19" equipment
racks and approximately twenty-five 24-port patch
panels for both voice and data.
Horizontal cabling installation totaling
approximately 200,000 feet of CAT 5e cable.
All terminations and testing for
the above (approximately 992 drops for 248 locations).
Termination and testing of
600 pair voice backbone cabling.
Installation of all cross connections
between Ameritech Centrex switch and premise horizontal
backbone (approximately 5,000)
All cross reference documentation
Procured and installed all phone
handsets for facility
Installation of backbone and horizontal
fiber and copper cabling throughout facility
Year round on-site presence
Kmart
Corporation
Retrofit and MAC work for the communications
infrastructure system throughout the entire campus
Complete renovation of existing
facility audio control system
Designed and installed new cable
tray support system required for the Main Server
Farm room
GM PCC North
Installation of communications infrastructure
cabling for 3,100 locations
Complete ABF fiber backbone system
(5.5 miles of fiber and 720 terminations)
Complete copper voice backbone system
(8,400 pairs throughout facility including four
1,800 pair splices)
A 20 year Siemon Cabling Systems
UltraLink Warranty was provided
2.5 Million feet of Cat 5e cable
installed, terminated, and tested
Electronic Data Systems
Installation of communications infrastructure cabling for 2,365 locations throughout the entire 21 floors of the 500 Tower at the GM Renaissance Center
Complete fiber backbone system
Complete copper voice backbone system
All RF coaxial cabling, terminations, and testing for the video transmission system.
A 20 year Siemon Cabling Systems UltraLink Warranty was provided.